All Glossary Terms
Commercial & Investment Last updated 2026-11-17

What Is a Phase I Environmental Site Assessment (Phase I ESA) in Florida Real Estate?

Advised by Mark Davis (FL Lic BK3209459) & Rachael Garnett (FL Lic SL3378601) — Align Right Realty Carrollwood

Quick Answer

A Phase I Environmental Check (ASTM E1527-21) reviews past records and site history on commercial or empty land. It spots pollution risks before a buyer closes.

How It Works Under Florida Law & Practice

Almost every SBA 504, SBA 7(a), and bank commercial loan asks for a fresh Phase I report from a vetted engineer.

Engineers study old aerial photos, city logs, dry-cleaner files, buried tank records, and nearby spills without digging soil yet.

If the Phase I flags a site worry, buyers request a Phase II lab test of soil and water before waiving their inspection period.

Tampa Bay & Central Florida Example

Buying an older corner on Nebraska Avenue or US 19 near an old repair shop or cleaner takes a clean Phase I check so buyers stay legally protected.

Local Advisor Playbook

How Mark & Rachael Handle It

We write 30 to 45 day check windows into commercial and land deals. Trusted Florida environmental engineers stay on call to move fast.

Common Questions About Phase I ESA

How long does a Florida Phase I site check take?
A standard Phase I report takes 2 to 3 weeks. If lab soil borings are needed under Phase II, add 3 to 4 weeks.
How long does a Phase I report stay fresh for bank loans?
Under ASTM E1527-21 rules, your Phase I report generally must be dated within 180 days before closing day.